Transmission lines

Will all the overhead wires and timber poles be removed?

All overhead distribution cables will be removed.  All timber power poles except those carrying transmission (high voltage) lines will be removed.  Transmission lines will not be underground as part of the State Underground Power Program.  

In previous projects, owners of properties adjacent to transmission lines have received a 50% discount on the underground power service charge. 

The location of transmission lines is shown in the plans below. 

Victoria-Park-West-Transmission-Line-Locations.jpg


Victoria-Park-East-Transmission-Lines-Location.png

 

Carlisle-North-Transmission-Lines-Location.jpg